How much are utilities in Jacksonville, TX?
Our estimate for Jacksonville, TX: about $233.27 a month for water, sewer, trash and electricity: water $27.31 (12%), sewer $50.62 (22%), trash $25.34 (11%) and electricity $130.00 (56%). That is 6% below the average of the 66 Texas cities we cover in the competitive market with one delivery area ($248.24), 23rd lowest of 66.
An estimate at 5,000 gallons of water and 1,000 kWh a month, worked out from published rates: not a quote for your home and not an average of bills. Water and sewer at 5,000 gallons and trash from Jacksonville's published rates (read November 22, 2026); electricity 1,000 kWh at the median advertised price of standard plans in the Oncor Electric Delivery area on Power to Choose (read November 22, 2026; an advertised price, not a quote). Shares are rounded to whole percent. Rates change - check with the provider.
What utilities cost in Jacksonville (Cherokee County, population 14,658 in 2025) and how to set them up at a new address, from the published rate schedules and start-service pages. Read November 22, 2026. Rates change - check with the provider.
Jacksonville utility costs, line by line
Estimates for a household using 5,000 gallons of water and 1,000 kWh of electricity in a month, worked out from published rates. Not a quote for your home; each line is explained further down.
| Water, 5,000 gallons (estimate from the published rates) | $27.31 |
| Sewer, 5,000 gallons (estimate from the published rates) | $50.62 |
| Trash, monthly charge, plus sales tax where applicable | $25.34 |
| Electricity, 1,000 kWh at the median advertised price of standard plans on Power to Choose (Oncor Electric Delivery area; read November 22, 2026; an advertised price, not a quote) | $130.00 |
| Sum of these estimates, with electricity at the median advertised price of standard plans (Oncor Electric Delivery area) | $233.27 |
For context, not a price for Jacksonville: at the Texas competitive-market average price (EIA-861, 2025: all retail electric providers in the state, energy and delivery together), 1,000 kWh would cost $172.70, and the sum of these estimates would be $275.97. The lines above use the local Power to Choose median instead.
Deposit to start city utility service: $75.00 (details).
Jacksonville water bill and water rates
Provider: City of Jacksonville.
| Residential water charge, inside city limits | Amount |
|---|---|
| Monthly base charge, 3/4 in meter, no gallons included | $14.76 |
| 0 to 2,000 gallons, per 1,000 gallons | $2.09 |
| 2,000 to 10,000 gallons, per 1,000 gallons | $2.79 |
| Over 10,000 gallons, per 1,000 gallons | $3.49 |
Effective date given by the provider: 2026. Schedule: Adopted 2026 Master Fee Schedule (updated through 10 June 2026).
Estimated water bill at 5,000 gallons a month
| Base charge | $14.76 |
| 0 to 2,000 gallons: 2,000 gallons x $2.09 per 1,000 | $4.18 |
| 2,000 to 5,000 gallons: 3,000 gallons x $2.79 per 1,000 | $8.37 |
| Estimate at 5,000 gallons | $27.31 |
This estimate includes: the base charge and volume tiers only.
An estimate computed from the published rates for a household using 5,000 gallons in a month, not a quote for your home. It contains only what is listed above; other charges on the bill (for example drainage or stormwater fees) and taxes are not added.
From the schedule: Water Rates (Residential Inside), 2026 column used. The schedule also lists 2027 (subject to change): base 15.08; 0-2,000 2.14; 2,001-10,000 2.86; 10,001+ 3.58, and further years to 2030. Residential outside = 1.5 x.
Source: jacksonvilletx.org, effective 2026, read November 22, 2026. Rates change - check with the provider.
Jacksonville sewer rates
Provider: City of Jacksonville.
| Residential sewer charge, inside city limits | Amount |
|---|---|
| Monthly base charge, residential minimum charge, no gallons included | $25.02 |
| 0 to 10,000 gallons, per 1,000 gallons | $5.12 |
Effective date given by the provider: 2026. Schedule: Adopted 2026 Master Fee Schedule (updated through 10 June 2026).
Estimated sewer (wastewater) bill at 5,000 gallons a month
| Base charge | $25.02 |
| 0 to 5,000 gallons: 5,000 gallons x $5.12 per 1,000 | $25.60 |
| Estimate at 5,000 gallons | $50.62 |
This estimate includes: the base charge and volume tiers only.
An estimate computed from the published rates for a household using 5,000 gallons in a month, not a quote for your home. It contains only what is listed above; other charges on the bill (for example drainage or stormwater fees) and taxes are not added.
Note: volume charge applies to 0-10,000 gal only (10,001+ shown as '-').
From the schedule: Wastewater Rates (Residential Inside), 2026 column: minimum charge 25.02; 0-10,000 gal 5.12 per 1,000; 10,001+ shown as '-' (no charge above 10,000). 2027 (subject to change): minimum 27.87, 5.70 per 1,000. Whether the minimum includes gallons is not stated (recorded as 0).
Source: jacksonvilletx.org, effective 2026, read November 22, 2026. Rates change - check with the provider.
Jacksonville trash and recycling
Provider: City of Jacksonville (billed on the utility bill).
Residential charge: $25.34 a month, plus sales tax where applicable.
Service: one 95-gallon residential cart picked up twice per week; additional cart 4.37 per month (limit 4); optional bulky subscription 10.00 per month.
From the source: Read from a rendered image of page 9 of the fee schedule (text extraction scrambled the table). Recycling not mentioned.
Source: jacksonvilletx.org, effective 2026, read November 22, 2026. Rates change - check with the provider.
Electricity in Jacksonville
Jacksonville is in Texas's competitive electricity market. You choose a retail electric provider: it sells you the electricity, sets your price per kWh, bills you and opens your account. The delivery utility owns the poles and wires, reads the meter and restores power after an outage, whichever retail provider you choose. Power to Choose is the state's official comparison site, run by the Public Utility Commission of Texas.
| Delivery utility (poles and wires) | Delivery charge only, 2025 average (EIA-861) | Standard plans on Power to Choose (English, not prepaid, not time-of-use) | Retail providers offering those standard plans | Median advertised price at 1,000 kWh |
|---|---|---|---|---|
| Oncor Electric Delivery | 5.64 cents per kWh | 161 | 40 | 13.00 cents per kWh |
The delivery charge is the delivery utility's own residential revenue divided by kWh delivered (EIA-861, 2025): a yearly average of the delivery part only, which your retail provider passes on in your bill. The plan count, the provider count and the median price are from Power to Choose's list of current offers, read November 22, 2026, all over the same standard plans: English-language, not prepaid, not time-of-use. The full list for an area is longer, because it also holds prepaid and time-of-use plans and each plan again in Spanish. The median is the advertised price per kWh at 1,000 kWh a month. An advertised price is not a quote; read the plan's Electricity Facts Label.
Average residential price in Texas's competitive market in 2025: 17.27 cents per kWh (EIA-861, 2025: all retail electric providers' residential revenue divided by kWh sold, energy and delivery together). This is a statewide average, not a price for Jacksonville or a quote. At that average, 1,000 kWh in a month would come to about $172.70.
Source: EIA-861 annual electric power industry report, 2025 data (eia.gov), read November 22, 2026. Rates change - check with the provider.
Set up utilities in Jacksonville
Water, sewer and trash
The provider publishes only some of the steps; these are the ones it gives.
- Complete the Residential Services Application (online e-sign form linked from the Utility Billing page)
- Complete the Sanitation (Trash) Application
- Pay the 25 application fee and 75 deposit
- Apply
- Online application or form
- Office
- Utility Billing, 215 E. Rusk St., Jacksonville TX 75766
- Phone
- 903-586-3510 (Utility Billing / City Hall)
- Fees
- UB application fee 25 (nonrefundable); service transfer fee 50; reconnect fee 35 (50 after hours)
Source: jacksonvilletx.org, read November 22, 2026.
Deposit
$75.00. Residential deposit 75 (refundable, payable on the service date); 300 if there is a prior uncollected balance; plus a 25 nonrefundable application fee
Source: jacksonvilletx.org, read November 22, 2026. Rates change - check with the provider.
Electricity
Choose a retail electric provider (compare plans on Power to Choose) and sign up with it. The retail provider asks the delivery utility (Oncor Electric Delivery) to connect the address; any deposit is set by the retail provider.
Internet
Which internet providers serve an address depends on the street, not the city. The FCC's National Broadband Map lists the providers that report service at a given address.
Utilities serving Jacksonville
- Oncor Electric Delivery (delivery company (competitive market))
Nearby cities
- Tyler water + sewer $118.84
Listed cities in the same county, or in the same three-digit ZIP area. Water + sewer: estimate at 5,000 gallons. All Texas cities.
Sources for Jacksonville
- https://www.jacksonvilletx.org/DocumentCenter/View/6317/2026-Adopted-Master-Fee-Schedule
- https://www.jacksonvilletx.org/656/Utility-Billing
- https://www.eia.gov/electricity/data/eia861/
- https://www.powertochoose.org/ (ZIP lookup)
- https://www.powertochoose.org/en-us/Plan/ExportToCsv
All read November 22, 2026. Population: U.S. Census Bureau, Vintage 2025 estimates. Found an error? Tell us; we check it against the source.